Metoda ključne putanje (CPM)

A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.

0
Hozzáadás a Szójegyzékemhez

Mit szeretne mondani?

Hozzászólás közzétételéhez be kell jelentkeznie.

Terms in the News

Featured Terms

Vesna Kovacevic
  • 0

    Terms

  • 0

    Szójegyzékek

  • 3

    Követő

Ipar/Tárgykör: Computer Kategória:

netbook računri

Vrsta prijenosnog računara koji je posebno dizajniran za bežične komunikacije i bežični pristup Internetu.

Beküldő

Featured blossaries

China Studies

Kategória: Politics   1 11 Terms

Unidad 6

Kategória: Law   1 10 Terms

Browers Terms By Category